Monday, 5 May 2014

Elevations- after cladding




Interiors after plastering

from the dining area, looking towards the hall

false ceiling in the hall
false ceiling in the dining area

the kitchen

second floor common bathroom




Sunday, 9 March 2014

A look from the inside

hall, at the end of the stairs - floor 1


from the hall, towards the pooja and dining rooms


pooja and dining rooms


Kitchen area

Kitchen+store room

view of the hall from outside the pooja room


stairs


Pratyu's room+ sitout - floor 2

master bedroom - floor 2

second bedroom - floor 2

stairs from the terrace door

External Plastering - Feb 2014

Monday, 3 February 2014

Window frame fixing and grills for balcony

 after fixing window frames - Jan end
From the hall after grills were fixed - Feb 03 2014

Front elevation after grills were fixed- Feb 03 2014

Sunday, 19 January 2014

Jan 20 2014

1. Second floor roofing done
2. frames for doors and windows done

frame for the door-cum-window on first floor

 main door

frames of internal doors and windows


the facade as of now


staircase room from the terrace

Sunday, 12 January 2014

2nd floor master bed room


2nd floor study room


2nd floor kid's room with sitout

view of staircase room from the side


lintel level work progressing: end of dec 2013



front view in december


RCC for terrace




first load of concrete: Jan 8th


Terrace roofing done: Jan 8th 2013