Construction blog
Friday, 15 November 2013
November 2013- first floor
Columns raised on first floor and drip curing method in place
Deploying the curing mechanism
View from front bedroom area
walls being raised till lintel level
Side view from staircase side
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)