September 2013 construction
September 2013:
Steel ready for columns
- Column footing
- Column pedestal
- Column bar bending, concreting till lintel level (7ft)
- Plinth centering and concreting
- ground floor levelling with mud and concreting
Steel ready for columns
Footing steel
Footing steel placed in column pits
Steel for columns placed
Concreting for footing and foundation for columns
After removal of centering
Plinth beam steel
Plinth beam fixed
Centering done and concreting in progress for plinth beams
vibrator being used for concrete to spread uniformly below steel
Mud being filled for levelling
Concreting for floor, centering for columns
Starter marking for columns
Completing of column concreting, walls being built